Bivertix
§ 01Practice

Cut scrap.Stop breakdowns.Keep your know-how.

We help UK manufacturers, contractors and fleet operators spot problems earlier, stop breakdowns before they happen, and keep the know-how of people who are about to retire. We set it up, prove it on a pilot, and support it after.

FIG. 01 · ASK YOUR OWN MANUALSEXAMPLE · DRIVE RESET
ANSWER · 6 SOURCES CHECKEDKNOW-HOW CAPTUREstep 3ref §4.2expertpart-ofmust-dodemostep 3ref §4.2expertpart-ofmust-dodemo“how do I resetthe ABB drive?”ProcedurePRC-4421ManualMAN-2207EngineerM. HartleyPartABB ACS580SafetySOP-12Video2018-11-04ANSWER3 steps · 47s read
06 sources · one plain-English answer
shows where it came from
WE FIX
03
Defects · Breakdowns · Lost know-how
SECTORS
03
Manufacturing · Construction · Logistics
TEAM EXPERIENCE
09y
Before Bivertix · est. 2025
FIRST PILOT
04w
Kick-off to working pilot
§ 02What we fix

Three problems we fix.
One team to build, run and support them.

SHEET 2 / 6
FORMS PIL-01 · PIL-03
§01 · PIL-VISCameras that check every part

Quality inspection

Cameras on your line check every part as it passes, so defects are caught at the source, not by your customer. Scratches, cracks, wrong dimensions, missing parts — each one logged with a photo.

99.4%
of defects caught · median, 12 deployments
READ THE BRIEF →
§02 · PIL-PRDPredictive maintenance

Breakdown prevention

RMS5.4 mm/sPEAK9.1 mm/sTREND+24%/wkSTATEDEGRADING

Your machines and vehicles tell you they're about to fail, days before they do. We read the vibration, heat and running data you already have, so repairs are planned, not panicked.

14d
median advance warning
READ THE BRIEF →
§03 · PIL-KNWAsk your own manuals

Know-how capture

Your best engineers are retiring, and much of what they know was never written down. We capture it, with your manuals and drawings, so anyone can ask a question in plain English and get the answer and where it came from.

47s
median time to an answer · vs 18 min
READ THE BRIEF →
§ 03How we ship

Four steps.
You see it working on your site inside a month.

SHEET 3 / 6
FORM ENG-01
▼ PILOT LIVE · WK 06
01Discover
DSC · 2 WEEKS
02Pilot
PLT · 4 WEEKS
03Deploy
DPL · 4 WEEKS
04Support
SPT · ONGOING
WK 00
WK 02
WK 06
WK 10
WK ∞
§ 01 · DSC
Discover
2 weeks
We walk your site, check your data and rank what hurts most.
§ 02 · PLT
Pilot
4 weeks
A small, sized pilot on your own real data.
§ 03 · DPL
Deploy
4 weeks
Roll it out, connect it to your systems, hand over to your team.
§ 04 · SPT
Support
ongoing
We watch it, keep it accurate and train your team to run it.
§ 04Where we deploy

Three sectors.
Built for the operations that built Britain.

SHEET 4 / 6
FORMS SEC-01 · SEC-03
§01 · MFG

Manufacturing

Less scrap, fewer stoppages, know-how that stays. scrap rate · unplanned downtime · lost know-how.

TYP. ENGAGEMENT
£25k–£80k
4–8 wks
FUNDING FIT
Made Smarter · R&D Credits
OPEN · MFG
§02 · CON

Construction

Fewer RFIs, fewer snags, safer sites. RFI delays · site safety · drawings out of sync.

TYP. ENGAGEMENT
£20k–£60k
3–6 wks
FUNDING FIT
Innovate UK · R&D Credits
OPEN · CON
§03 · LOG

Logistics

More vehicles on the road, fewer surprises. fleet uptime · demand forecasting · dock throughput.

TYP. ENGAGEMENT
£30k–£90k
4–10 wks
FUNDING FIT
KTP · R&D Credits
OPEN · LOG
§ 05 · NEXT STEP · DIAGNOSISFREE · NO LOGIN · ~5 MIN

Tell us where it hurts.
Get a plan back.

Five minutes. Three questions. We read your operation, size the opportunity, and write back a plan with the funding routes that might cover it.

§01ReadWe read your answers and the shape of your operation.
§02SizeWe estimate what it costs you each year and rank the best fixes.
§03PlanYou get a written plan: what to do first, likely cost and payback, and funding routes.
Prefer to talk first? Book a call with a human →
WORKBOOK · STEP 01 / 03BVX-DIAG-2026

Q1 — Where's it hurting most
this quarter?

Pick up to three. You can add detail in your own words at question 3.
▍estimate :: 3 pains selected · est. annual cost £313k–£480k● live estimate
SAVE & RESUME ANY DEVICE
NO SIGN-UP REQUIRED